This QLS facility is designed to support high-volume storage and efficient distribution, combining temperature-controlled warehousing with modern infrastructure and operational support spaces.

Key specifications:
- 22,000 pallet positions
- Temperature-controlled storage: +12°C to +20°C
- Dry warehouse with office spaces (G+M)
- Showroom facilities (G+M)
- Staff accommodation buildings (G+2)
- Guard room, substation, and LPG tank
Project Details:
- Plot Area: 27,883.39 sqm
- Built-Up Area (BUA): 22,731.91 sqm

Key specifications:
- 21,000 total pallet positions supporting high-capacity operations
- Multi-temperature storage capabilities, including:
- Frozen
- Temperature-controlled
- Ambient storage
- 12 warehouse units comprising 1 cold store and 11 dry stores
- Modern office facilities (G+1) with two integrated showrooms (G+M)
- Two on-site staff accommodation buildings (G+2) supporting round-the-clock operations
- Strategically designed infrastructure to support efficient storage, handling, and distribution
Facility Size:
- Plot Area: 36,333.00 sqm
- Built-Up Area (BUA): 25,324.54 sqm

